Projects, click on images to enlarge
- Trilogic, racing trimaran custom work
- UCC Carbon Fibre Wave Energy Prototypes
- Constructing the OWC Buoyancy Tanks
- Testing in wave pool
- Fibreglass roof 1
- Fibreglass roof 2
- Fibreglass roof 3
- Underside of front clamshell repairs
- Front clamshell
- Vacuum bonding in carbon stiffeners
- Front clamshell primed
- Sprayed and rebuilt
- Front clamshell back on body
- RTE featured programme special bath for Michael
- Inner and arm rests glassed
- Room To Improve filming
- Glassed, sealed and flow coated
- Ann and young Michael
- The finished tub
- Fibreglass roof to Extension, measuring out the glass,
- Roof glassed, cured and sanded
- Topocoat being applied over glass
- GPO Dublin Making mould casings to disguise the damage
- Before
- After
- Race car engine cover pattern for moulding
- Moulding first side, not the locater holes for second half.
- Mould built up with flange joints
- Mould cured, trimmed and first half removed
- Gelcoating and glassing in the new mould
- Finished new lightweight part
- Repairs for RNLI to tender boat
- Gunnel ripped off on port side
- Gunnel glassed back in place
- Join glassed inside and out
- Seem top coated
- New bilge sump to be fabricated and drain holes filled
- Bilge tray connected to pump
- Return angle piece to collect low lying water.
- Bilge system complete and drain holes filled.
- 22mt wind turbine blade repairs
- Transit damage to blade 1
- Transit damage to blade 3
- Areas of damage before
- Areas of damage complete
- Taking mould of arch to reproduce new lightweight version
- Removing old heavy arch
- Old arch weight 2.5kgs
- New lighter moulded arch at 0.75kgs
- Filling and fairing join lines
- Arch and sill sprayed
- Jet ski repair to nose
- Cracked area ground back to solid base and laminate rebuilt
- Area reshaped, filled, faired, primed and painted
- Lake boat restoration 1
- 2
- 3
- 4
- 5
- Lake boat restoration complete
- Pond repair with fiberglass
- Previously sealed with a waterproof paint ?
- Old side walls and base stripped and concrete left to dry out
- New fiberglass base and side walls sealed with 2 layers and bonded flashings
- Laminate sanded flush for final topcoat
- Finished in a complimentary shade of polyester resin topcoat
- Repair to Vaxhaul VX 220 wing
Vaxhaul VX220 wing repair, fiberglass
- Car wing repair 2
Fiberglass car wing repair
- Car wing repair 3
Vauxhall VX220 wing repair
- Composites Training Course in UK
- Resin infusion testing and theory
- Resin infusion timing prediction tests
- Vac bagged pre preg repairs going into the autoclave for curing
- Damage testing repair quality
- Theory
- 17 foot Sea Kayak project, stitch and glue construction
- Deck installed and bonded
- Glassing the hull
Adding glass to the hull
- Forming the cockpit coaming with heat and clamps
Cockpit coaming
- Six layers of two pack marine varnish, painstaking work but the finish was worth it
Six coats of varnish
- Kayak complete ready for maiden voyage
- Beach buggy repairs
- Beach buggy lights to be flushed out
- Lights glassed and flushed over for new style
- Screen frame broken
- Frame glassed inside and out and reshaped
- Frame filled, primed and painted
- Lotus Exige Carbon rear clamshell
- Rear clamshell primed
- Carbon clamshell painted







































































































Find us on Facebook !